The production capacity of Zhuanlongwan coal mine of Ordos energy and Chemical Co., Ltd. has been expanded from 5.0mt/a to 8.0mt/a. The policy requires that coal preparation plants of the same scale must be equipped. In 2015, Shenzhou group built a 3.0mt/a dry process coal preparation plant. After separation, the calorific value of block clean coal increased by 1800kcal / kg and that of final clean coal increased by 1000kcal / kg. The project has the advantages of high product recovery rate, energy conservation and environmental protection.


ITEM

yield Wt%

ASH Ad%

Qnet,ar,Kcal/kg   NET CALORIFIC VALUE Qnet,ar,Kcal/kg

RAW COAL

100

37.60

3815

LUMP CLEAN COAL

20.90

6.30

5691

FINE CLEAN COAL

48.60

18.94

4887

REJECT

30.50

88.78

821

ORDOS ENERGY AND CHEMICAL CO.,LTD OF YANZHOU COAL INDUSTRY

TIME: 2022-03-07
FOLLOW WITH OUR WECHAT,?
TO KNOW MORE ABOUT SHENZHOU GROUP.

PRICE? YIELD? MODEL? AFTER-SALE SERVICE? PEASE LEAVE A MESSAGE ONLINE, WE WILL REPLY TO YOU AS SOON AS POSSIBLE.

ONLINE MESSAGE

性色生活片在线观看_亚洲av乱码一区二区三区_男同激情无码专区_亚洲人成网站18禁止大